







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Company in Reedley, CA
Reedley homeowners planning an ADU, garage conversion, or home addition are working with a housing stock most contractors never take the time to understand: 1920s bungalows with detached garages off alleyways, mid-century ranch homes on generous lots, and a hot, dry Valley climate that punishes shortcuts on insulation and HVAC sizing. Lodgewick ADU Builders handles all three jobs across Reedley under The Kingswell Guarantee – a written price before any work begins, a real arrival window, and a written guarantee on every project. Call (559) 354-0579 to schedule a free estimate.
Why Reedley Homes Are Different
Reedley’s housing stock runs from pre-1950s bungalows in the older downtown core to 1960s-80s ranch homes spreading east and south, and the difference matters when you’re adding square footage. Many older homes near downtown Reedley sit on alley-loaded lots, where the detached garage opens onto the rear alley rather than the street. That layout often makes a garage conversion or an “alley ADU” above the garage the cleanest path to more livable space, because the structure already sits at the back of the lot and the alley access handles parking without disturbing the front yard or triggering setback headaches. Homes in Reedley’s historic preservation district face another layer: zoning overlays that govern rooflines, setbacks, and exterior materials, so a pre-fab ADU that flies through permitting in a neighboring city may need design adjustments here. Russ Delmar and our team walk each Reedley project through those overlays before the first drawing is finalized, so homeowners are not surprised mid-permit. Then there is the heat. Central Valley summers regularly push past 100 degrees, which means every ADU we build in Reedley gets insulation and HVAC sizing that is not a code minimum – it is speced for actual July and August conditions. Winter fog is the other seasonal variable; we schedule exterior work around the low-visibility mornings when we can, and we tell homeowners upfront which phases of the job will move slower in December and January.
Our Main Reedley Services
These are the three jobs Reedley homeowners call us about most, and each has its own dedicated page with local pricing, timelines, and what to expect.
Home Addition Contractor in Reedley
Adding a bedroom, a second bathroom, or a family room onto a Reedley ranch home means matching rooflines and stucco to what is already there, then upgrading the existing HVAC to carry the new square footage through Valley summers. We handle the full scope: plans, permits, foundation, framing, and finish. On older downtown properties, additions often need to respect historic-preservation overlays, so we bring the design and materials questions to the city early. Learn more on the Home Addition Contractor in Reedley page, including what a typical Reedley addition costs.

Garage Conversion Contractor in Reedley
Reedley’s older homes often have detached garages off the alley, which makes a garage conversion the fastest way to add a rental unit, a home office, or an in-law suite without building new foundation walls. The existing structure usually needs floor leveling, new electrical service, insulation, and a mini-split or ducted HVAC – and we handle all of it with a written price before work starts. Many of these conversions qualify as accessory dwelling units under California law. See the full scope and pricing on the Garage Conversion Contractor in Reedley page.

ADU Builders in Reedley
A backyard ADU – a small standalone house on your existing lot – is where Reedley’s large lots shine. We build site-framed ADUs and also install pre-fab units from brands like Cover and Boxabl where the lot, budget, and timeline favor factory construction. Either way, the unit is permitted, foundation work is done by our own crews, and the guarantee is in writing. Read the full ADU Builders in Reedley page for pricing ranges and what moves the number up or down on your specific lot.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Brands We Service in Reedley
Lodgewick installs and finishes ADUs from Cover, Boxabl, Dvele, and Mighty Buildings, and our crews are hands-on familiar with each manufacturer’s foundation, connection, and finish requirements. That matters in Reedley, where prefab units must still clear the city’s zoning overlays. Visit our brands page for the full list and the trade-offs between factory-built and site-framed.
Pricing for ADU Company in Reedley, CA
| Service | Typical range in Reedley |
|---|---|
| Site-framed backyard ADU (studio, 400 sq ft) | $160,000 – $210,000 |
| Site-framed backyard ADU (1-bed, 600 sq ft) | $210,000 – $275,000 |
| Site-framed backyard ADU (2-bed, 800+ sq ft) | $280,000 – $370,000 |
| Prefab ADU (Boxabl Casita, installed) | $115,000 – $155,000 |
| Prefab ADU (Cover or Mighty Buildings, installed) | $210,000 – $310,000 |
| Garage conversion to studio ADU | $95,000 – $150,000 |
| Garage conversion to 1-bed ADU | $130,000 – $195,000 |
| Home addition (single room, 200 – 300 sq ft) | $95,000 – $160,000 |
| Home addition (primary suite with bath) | $160,000 – $240,000 |
| Home addition (two rooms or family room expansion) | $210,000 – $330,000 |
What pushes a Reedley project toward the top of these ranges: historic-preservation overlay requirements, structural work on a 1920s foundation, upgraded electrical service if the existing panel is original, and high-efficiency HVAC sized for Valley heat. Every Lodgewick quote is a written, itemized price before work begins – no change orders at the door.
Neighborhoods We Serve in Reedley
Our crews work throughout Reedley, from the older downtown streets with alley-loaded garages to the ranch neighborhoods east of Reedley High and the newer lots off Manning Avenue. We typically respond to estimate requests in the Reedley area within one business day.
- Downtown Reedley (historic district)
- East Reedley near Reedley High School
- West Reedley off Manning Avenue
- South Reedley near the Kings River
Service Area – Cities Near Reedley
While this page is built for Reedley homeowners, our crews also serve the surrounding Central Valley communities. You can read the dedicated pages for Dinuba, CA, Parlier, CA, Kingsburg, CA, and Selma, CA. Dispatch and scheduling for each of those areas is coordinated from our Central Valley office.
Serving Reedley, CA - Our Local Coverage Area
We’re based in the Reedley area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Reedley

Once you accept a written estimate, we typically begin plans and permitting within two to three weeks. Reedley’s historic-preservation overlay can add review time on affected properties, which is why we bring design questions to the city early in the process. Call (559) 354-0579 to get a timeline for your specific lot.
Yes. We prepare and submit the permit package for your Reedley project, and we work directly with city staff when a property falls inside the historic preservation district or needs a zoning variance. Our written price includes the permit work we are doing, and we never ask you to pull the permits yourself.
No. The Kingswell Guarantee means the written price you approve before work begins is the price you pay – unless you request a change in scope in writing. If the work is not done right, our 365-Day Done Right Promise means we come back and make it right, in writing, at no charge. Call (559) 354-0579 for a free estimate.
What happens when you call
- 1A real person answersNo phone trees - talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Reedley Customers Say
"Added a suite for my dad. They walked us through every cost before a hammer swung and stuck to it. The written price is what we paid, no change orders."
- Ingrid Salazar"The ADU came out beautiful and the permitting, which terrified me, was handled start to finish. They kept me updated every week so I was never wondering what was happening."
- Shauna Mills"Good builders. Communication was mostly great, though there was a stretch where I had to chase an update during the permit wait. Once it got going again it moved fast and clean."
- Phil Ostrander





